Frequently Asked Questions
Below you will find information that might help you understand how to find things or learn about information you might need to know about your city or town.
Engineering Services - Land Development Engineering Permit Fees
19-
Engineering Services - Land Development Engineering Permit Fees
- Improvement Plan Checks
- Rough Grading Reviews
- On-Site Storm Drain Reviews
- Water Availability Analysis
- Water and Wastewater Capacity Analysis
- Stormwater Quality Review Fee
-
Engineering Services - Land Development Engineering Permit Fees
- Legal Description Check
-
Engineering Services - Land Development Engineering Permit Fees
- Will-Serve Letter
-
Engineering Services - Land Development Engineering Permit Fees
- Parcel Map Check
- Final Subdivision Map Check
- Easement/Summary Abandonment
- Public Utility Easement (PUE) and Planting Easement (PE) Dedication
-
Engineering Services - Land Development Engineering Permit Fees
- Encroachment Permits
-
Engineering Services - Land Development Engineering Permit Fees
- Curb and Curb Cuts - Drive Approach (100 linear feet maximum)
-
Engineering Services - Land Development Engineering Permit Fees
- Curb and Curb Cuts - Drive Approach (100 linear feet) - Staking
- Curb and Curb Cuts - Drive Approach (100 linear feet) - Paving
- Sewer Main (50 linear feet) - Staking
- Utilities - Major Construction - Paving
- Utilities - Service and Repair - Paving
-
Engineering Services - Land Development Engineering Permit Fees
- Curb and Curb Cuts - Drive approach (100 linear feet) - Paving
- Sewer Main (50 linear feet) - Paving
- Utilities - Major Construction - Paving
- Utilities - Service and Repair - Paving
-
Engineering Services - Land Development Engineering Permit Fees
In addition to the following minimum charge:
a. Clean up or dust control - $370 per street
b. Temporary paving - $233 per street
c. Temporary Barricades - $142 each
- Encroachment Permits
-
Engineering Services - Land Development Engineering Permit Fees
- Sewer Service from Lot to Main
- Sewer Main (50 linear feet)
- Utilities - Major Construction
- Utilities - Service and Repair
- Street lights
-
Engineering Services - Land Development Engineering Permit Fees
- Sewer Service from Lot to Main
- Sewer Main (50 linear feet)
- Utilities - Major Construction
- Rockwell or Storm Drain Connectors
- Street Construction
- Miscellaneous Improvements
-
Engineering Services - Land Development Engineering Permit Fees
- Sewer Main (50 linear feet)
-
Engineering Services - Land Development Engineering Permit Fees
- Utilities - Major Construction
- Utilities - Service and Repair
-
Engineering Services - Land Development Engineering Permit Fees
- Miscellaneous Improvements
-
Engineering Services - Land Development Engineering Permit Fees
- Investigation of Site
-
Engineering Services - Land Development Engineering Permit Fees
- Other Work Not Listed
-
Engineering Services - Land Development Engineering Permit Fees
- PCI Between 100 and 70 - Trench Depth over 4 feet
- PCI Between 100 and 70 - Trench Depth 4 feet or less
-
Engineering Services - Land Development Engineering Permit Fees
- PCI between 69 and 26 - Trench Depth over 4 feet
- PCI between 69 and 26 - Trench Depth 4 feet or less
-
Engineering Services - Land Development Engineering Permit Fees
- Cost Estimate over $1,000,000
Engineering Services - Land Development Engineering Water Fees
10-
Engineering Services - Land Development Engineering Water Fees
- Single story, single-family residences on a lot of 4,000 square feet or less.
- Two-story single-family residence on a lot of 4,000 square feet or less, provided the request for such a service is accompanied by a report from a licensed professional engineer that certifies that the 5/8 inch service is adequate to meet the needs of the proposed dwelling.
- a 5/8 inch "service" shall not be allowed for single-family dwellings of greater than 2 stories on lots less than 4,000 square feet.
-
Engineering Services - Land Development Engineering Water Fees
- Water Service Installation
- 1 inch service
- 1.5 inch service
- 2 inch service
- 3 inch service
- 4 inch service
- 6 inch service
- 8 inch service
- 10 inch service or larger
- Water Main Installation - residential, commercial or industrial
- Water Meter
- 1 inch Meter/New Service Pedestrian Lid
- 1 inch Meter / New service - Traffic Lid
- 1 inch Meter / Retrofit Service - Pedestrian Lid
- 1 inch Meter / Retrofit Service - Traffic Lid
- 1.5 inch Meter - Pedestrian Lid
- 1.5 inch Meter - Traffic Lid
- 2 inch Meter - Pedestrian Lid
- 2 inch Meter - Traffic Lid
- 4 inch Meter
- 6 inch Meter
- 8 inch Meter
- 10 inch Meter or larger
NOTE - Service used ONLY for the fire protection so no require a meter. All other new services require a meter.
This fee is charged at the time of the building permit or a separate water permit is issued for the construction of the water line on the property.
- Water Service Installation
-
Engineering Services - Land Development Engineering Water Fees
- Water Main Installation - Residential, Commercial or Industrial
Generally, this fee is charged at the time that the building permit is issued for the property. This fee applies to the old city area (Zone 1) and in the former Del Este area (Zone 2) where the City has significantly strengthened the infrastructure. This fee may be waived in the property owner has already participated in the cost of the water main service the property.
-
Engineering Services - Land Development Engineering Water Fees
- Water Connection for Main Extension
Generally, this fee is charged at the time the water permit is issued for the connection to an existing water main.
-
Engineering Services - Land Development Engineering Water Fees
- Fire Main Test
This fee is charged when a developer requests installation of a hydrant or hydrants. This fee is not charged for hydrants necessary to meet minimum spacing requirements.
-
Engineering Services - Land Development Engineering Water Fees
- Pavement Replacement - Residential (if needed)
- Pavement Replacement - Commercial (if needed)
- Pavement - Residential (Local Streets)
- Pavement - Commercial (Non Local Streets)
This fee is charged at the time that a building permit or water permit is issued for the construction of the water line on the property. This fee can be waived for dirt alleys or where the water line is located in an unimproved road or shoulder.
-
Engineering Services - Land Development Engineering Water Fees
- Outside City Limits Agreement
-
Engineering Services - Land Development Engineering Water Fees
- Reimbursement Agreement Preparation
Generally, this fee is charged immediately prior to the acceptance of the reimbursement agreement by the City Council. This fee is charged as directed by the Engineer.
-
Engineering Services - Land Development Engineering Water Fees
- Deposit to Install Meter on Fire Hydrant for Construction Water
-
Engineering Services - Land Development Engineering Water Fees
- 4 inch Meter
- 6 inch Meter
- 8 inch Meter
- 10 in Meter or larger
Engineering Services – Land Development Engineering Sewer Fees
10-
Engineering Services – Land Development Engineering Sewer Fees
Waste Capacity Charge
-
Engineering Services – Land Development Engineering Sewer Fees
Wastewater Capacity Charge
-
Engineering Services – Land Development Engineering Sewer Fees
Schools
-
Engineering Services – Land Development Engineering Sewer Fees
Retail/Commercial (FLOW/BOD/TSS)
- Group 1 - 400mg/l or less
- Group 2 - 401 mg/l to 900 mg/l
- Group 3 - 901 mg/l to 1,400 mg/l
- Group 4 - 1,401 mg/l or more
-
Engineering Services – Land Development Engineering Sewer Fees
Health Club - No Showers, Pool or Spa
-
Engineering Services – Land Development Engineering Sewer Fees
Market - Grocery (with bakery, food prepared on-site or garbage grinder)
-
Engineering Services – Land Development Engineering Sewer Fees
Subtrunk Charge
-
Engineering Services – Land Development Engineering Sewer Fees
Lateral Charge
-
Engineering Services – Land Development Engineering Sewer Fees
Reimbursement Agreement Preparation.
-
Engineering Services – Land Development Engineering Sewer Fees
Outside City Limits Agreement