Public Works Projects

SB1 Funded Slurry Seal Projects

Project Name Area Map
1 - Monticello/Crater Slurry Seal Project Map
2 - Capistrano Area Slurry Seal Project
3 - Manor Oak Area Slurry Seal Project Map
4 - Hashem Area Slurry Seal Project Map
5 - Robin Hood Area Slurry Seal Project Map
6 - Kavanagh Area Slurry Seal Project Map
7 - Glenwood Area Slurry Seal Project Map
8 - Sheldon Area Slurry Seal Project Map
9 - Poust Area Slurry Seal Project Map

Annual Maps for SB1 Funded Slurry Seal Projects

Project Area Map
2016 Slurry Seal Projects                     Map
2017 Slurry Seal Projects Map
2018 Slurry Seal Projects Map
2019 Slurry Seal Projects Map
2019 Proposed Slurry Seal Projects Map Legend

Public Works Projects by Division

Division Project Further Information Area Map
Multiple Measure L Funded Projects - The Public Works Department has multiple projects in the works using the Measure L funding. Check out our web page dedicated specifically to these projects! Measure L  
Fleet Parts Room Expansion - Fleet Services is currently divided in two buildings with two parts storage locations. This parts room will add the additional parts storage required for all shops and provide a connection between the neighboring buildings for streamlined labor sharing. Fact Sheet  
Fleet Heavy Duty Shop Expansion - Fleet Services is currently divided in two buildings and three shops. This new shop building will be one step closer to having all of Fleet Services in one building. Fact Sheet  
Streets Slurry Seal 2019 - The City of Modesto Public Works Streets Division will complete 96 lane miles of slurry seal during the 2019 slurry season. Fact Sheet Map
Traffic Emergency Vehicle Preemption Devices - Installation of Emergency Vehicle Presumption (EVP) systems and upgrading first generation phase detectors at signalized intersections within the City. Fact Sheet  
Traffic Fiber Drop in Traffic Signal Cabinets - Cutting and splicing into the existing fiber optic back bone to bring the fiber optic cable into traffic signal cabinets along Briggsmore Avenue, Standiford/Sylvan Avenues, and Oakdale Road. Fact Sheet  
Traffic High Friction Surface Treatment - This project will install High Friction Surface Treatment on a curved street segment on Scenic Drive and Orangeburg Avenue where a loss of traction may occur. Fact Sheet Map
Traffic High Voltage Street Light Conversions - Converting high voltage street lights to normal voltage LEDs Fact Sheet Map Work Schedule
Traffic Oakdale / Claratina Traffic Signal Installation - Installation of a new signal at Oakdale Road and Claratina Avenue Fact Sheet  
Traffic Rectangular Rapid Flashing Beacon - Installation of Rectangular Rapid Flashing Beacons (RRFB) at Carver/Teresa and Emerald/Maze Fact Sheet  
Traffic Synchronize Traffic Signals Downtown - Synchronize traffic signals at all intersections in the downtown area to improve traffic signal coordination. Fact Sheet  
Traffic Synchronize Traffic Signals Outside Downtown - Synchronize traffic signals at all intersections outside of downtown Modesto to improve traffic signal coordination. Fact Sheet  
Traffic Traffic Signal System Analysis - Hire outside consultant to analyze the City of Modesto’s traffic signal
operations and propose future modifications system wide.
Fact Sheet  
Traffic Traffic Signal Controller Update - Upgrade to Model 2070 LX traffic signal controllers. Controllers regulate the flow of intersection traffic by directing the indications for motorists and pedestrians crossing the intersection with preset timing controlled by the City’s network. This huge technology advancement will improve communication and operations of signals within Modesto! Fact Sheet  
Traffic Upgrade ATMS Software and Communications - Purchase and installation of communication equipment for Modesto’s Automated Traffic Management System (ATMS).  Fact Sheet  
Traffic Upgrade Traffic Signals 2013 - Update traffic signals at 9th/B, 7th/G, 7th/H, and 7th/I Fact Sheet  
Traffic Upgrade Traffic Signals 2015 - Update traffic signals at Paradise/Martin Luther King, Dale/Veneman, and Kansa/Emerald Fact Sheet  
Traffic Upgrade Traffic Signals 2017 - Update traffic signals at Paradise/H, 1st/H, 11th/Needham, and 9th/Tully Fact Sheet  
Transit Amtrak Station North Parking Lot Expansion - This project will expand the parking options at the Amtrak station, by adding a parking lot on the northside of the station.  Fact Sheet  
Transit Downtown Transit Center Expansion - This project will expand the Transit Center to provide more
dispatching space for the Modesto Area Express operation.
Fact Sheet  
Transit Downtown Transit Center Improvements - This project will improve the Transit Center and keep it in a state of good repair. Several projects in the building and throughout the property are planned. Fact Sheet  
Transit Electric Buses and Charging Infrastructure - This project will purchase five electric buses and associated charging stations at the Bus Maintenance Facility. Fact Sheet