What type of condition do Single-family residences qualify for the 5/8 inch connection fee?
  • Single story, single-family residences on a lot of 4,000 square feet or less.
  • Two-story single-family residence on a lot of 4,000 square feet or less, provided the request for such a service is accompanied by a report from a licensed professional engineer that certifies that the 5/8 inch service is adequate to meet the needs of the proposed dwelling.
  • a 5/8 inch "service" shall not be allowed for single-family dwellings of greater than 2 stories on lots less than 4,000 square feet.

Show All Answers

1. What type of condition do Single-family residences qualify for the 5/8 inch connection fee?
2. What water fee pays for the time and materials required to install the water service from the City water main to the property line?
3. What water fee pays for the construction of the specific water main that extends down a public right of way to serve a specific property?
4. What water fee pays for the time required to connect a new water main to an existing "live" main for making the connection from a new subdivision to an existing water main?
5. What water fee pays for the time and materials required to install a fire hydrant in the public right-of-way?
6. What water fee pays for the removal and replacement of pavement in the street or alley required for the installation of a water service?
7. What water fee pays for the time required to prepare an Outside City Limits Agreement, including review of costs and administrative preparation?
8. What water fee pays for the time required to perpare a water reimbursement agreement, including review of costs and administrative preparation?
9. What water fee includes backflow?
10. What water fee includes strainer?